Commercial solar generates hardest in the middle of the working day, which is exactly when most sites are drawing the most power. We model it against your half-hourly data before anyone talks about panels.

Generation matched to your working day, not to roof area
Structural and roof condition checked before design
Network operator applications handled for you
Installed around your operating hours, in phases if needed
Start your enquiry

Find out how commercial solar could cut your bills

Commercial feasibility rests on how much of the generation your site would actually use, so we start with a few details about the building and your operating pattern. Half-hourly consumption data can follow once we’ve spoken.

Takes about a minute, and there’s nothing to pay

Site survey and feasibility modelling at no cost

Warehouses, industrial units, offices and retail

Answer these few questions to start your quote

Prefer to talk? Call us on 0800 888 6886

Two Ways In

Start with the roof,
or do the whole site

Plenty of sites start with panels and add the rest later. That works, provided the first system is designed with the rest in mind — which is the part most installers skip.

Solar on its own

A roof-mounted array sized to the load your site draws during daylight hours. The simplest route, the shortest install, and usually the strongest return per pound for a business that operates weekdays.

Best where most of your consumption happens between nine and five
No change to how the site runs day to day
Designed so storage and charging can be added later
Phased across multiple roofs or units where that suits you

The usual starting point for warehouses and industrial units.

Solar, storage and charging

Panels to cut the daytime load, storage to carry generation into evening and weekend shifts, and charge points for the fleet or the staff car park — all sharing one supply and one design.

Suits shift patterns, extended hours and weekend operation
Load management keeps everything inside your existing capacity
One survey, one design, one set of network paperwork
Charge the fleet on your own generation rather than the grid

Worth modelling if you run outside daylight hours.

Twelve months of half-hourly data is all we need to model it properly.

Commercial Solar
Why DW Solar

Why businesses choose us for commercial solar

A commercial array is a capital decision, and it gets signed off on numbers rather than enthusiasm. So we start with your half-hourly consumption and build the case from there — including the parts that make the case weaker, because you will find those out eventually anyway.

Modelled on your actual data

Twelve months of half-hourly consumption tells us how much of the generation you would genuinely use on site, which is what drives the return.

The roof checked before the design

Structural loading, roof construction and remaining life. There is no point fitting a twenty-five year array to a roof with eight years left in it.

Network applications handled

Anything beyond a small system needs your network operator’s agreement before it can be connected. We prepare and submit it, and we tell you the realistic timescale.

Installed around your operation

Out of hours, at weekends or in phases across units. We have worked on live sites that could not stop, and we plan for that from the survey.

THE BUSINESS CASE

What commercial solar
does for the balance sheet

Generation when you need it

Solar peaks in the middle of the day, which is when most commercial sites draw their heaviest load. Little of it needs storing to be useful.

Insulation from price swings

The electricity you generate on site is not subject to the next contract renewal. It makes a chunk of your energy cost predictable for decades.

Roof space finally earning

A warehouse or factory roof is usually the largest unused asset a business owns, and it needs no extra land or floor space to generate.

Evidence for tenders and reporting

On-site generation is a concrete answer when a client, a framework or an ESG report asks what you are doing about emissions.

Tax treatment worth asking about

Commercial solar can attract capital allowances, and your accountant is the right person to confirm what applies to your business.

Scales with storage and charging

Add a battery for shift patterns or charge points for the fleet later, without redesigning what is already on the roof.

Site survey and feasibility modelling at no cost.

What Our Customers Say

Brands we fit

Sigenergy
solar edge
JA Solar
HOW IT WORKS

From consumption data
to commissioned array

1
Data and feasibility

You send twelve months of half-hourly consumption. We model how much generation the site would actually use.

2
Site and roof survey

Structural loading, roof construction and remaining life, switchroom, cable routes and access.

3
Design, application and quote

Full design, network operator application submitted, and a written quote with the assumptions stated.

4
Installation

Scheduled around your operation — out of hours, weekends or phased across units.

5
Commissioning and handover

Testing, certification, monitoring set up, and O&M arranged if you want it.

No cost, and no commitment to go any further.

Questions

Commercial solar FAQs

The questions that come up on site surveys and in board papers. If yours isn’t here, ask — we’d rather answer it now than have it surface at sign-off.

Want the numbers for your site?
Site survey and feasibility modelling at no cost.

It shouldn’t. Most of the work happens on the roof, and the parts that affect the building — the connection into your switchgear and commissioning — are short and can be scheduled out of hours.

On live sites we work at weekends, overnight or in phases across units. We agree that programme at the survey, not on the first morning.

It depends on the structure as much as the area. We check the roof construction, its condition and whether it can carry the additional load before anything is designed, and we involve a structural engineer where the situation calls for it.

The other limit is your electricity supply and what your network operator will allow you to connect, which is often the binding constraint rather than the roof.

Usually you should re-roof first. An array is a twenty-five year asset, and taking it off and refitting it to replace the covering underneath costs far more than doing the two in the right order.

We’ll tell you if that’s the situation. It costs us an order in the short term and saves you a great deal in the long one.

For anything beyond a very small system, yes — a commercial array needs your network operator’s agreement before it can be connected, and that has to be applied for rather than simply notified.

We prepare and submit the application and keep you updated. Timescales vary considerably by region and by how much spare capacity your part of the network has, and we’ll give you a realistic expectation rather than an optimistic one.

Roof-mounted solar on many commercial buildings falls under permitted development, but the allowances are more limited than on houses and there are exceptions — listed buildings, conservation areas, some site types and anything above certain thresholds.

We check it as part of the survey and tell you if an application is needed.

Commercial solar can attract capital allowances, and there are reliefs that have applied to on-site renewable generation. What your business can actually claim depends on its circumstances and on the rules at the time you invest.

We’re electricians, not tax advisers, so we won’t quote you a figure. Ask your accountant — and if it helps, we’ll give them the equipment breakdown they need to answer properly.

Yes, and we design the original system so you can. Leaving headroom in the switchgear and planning the cable routes at the outset costs almost nothing; retrofitting around a system that ignored the possibility can cost a great deal.

It can be, but the lease term matters more than anything else. If the remaining term is comfortably longer than the payback period and your landlord will consent, the case can be strong.

You’ll need the landlord’s written agreement and clarity on what happens to the array at the end of the lease. We’ll tell you honestly if the numbers don’t work on the term you have left.

Find out what your roof could take off your bills